Trade Training Labs

Trade Training Labs

Interactive 3D models for Champions Skills Academy classes. Walk trainees through a real house, fixture by fixture, in the same order as the curriculum.

Water heaterLavKitchen Water serviceTo sewerVent

Labs by program

Each lab opens in the browser. Pick a room, a PSI day, or search for a part once inside.

PSI

Plumbing Safety Inspection

Residential plumbing system

A three-bedroom, two-bath ranch with basement: 73 components across water, gas, and DWV, plus 21 detailed fixture models with product specs and manuals.

Mechanical roomKitchenBath 1Cadet PRO toiletWASHLET S7

Open

Water heater anatomy

Atmospheric gas water heater with 28 callouts and a cutaway of the tank, burner, and venting.

Open

Water Quality

Sales and training

Halo treatment equipment

The Halo 5, CK10 softener, and RO Ultra Plus live inside the plumbing system as detailed models.

Halo 5CK10 softenerRO Ultra Plus

Open

Drain Technician Development

No labs yet.

Leadership Development

No labs yet.

Browse by PSI day

Every day that uses the models, with the plumbing sections covered. Links open the plumbing system on that day’s walkthrough.

  1. Day 2: How house plumbing works

    • How your plumbing works 16 stops
    • PSI inspection preview 11 stops

    Open Day 2 in the plumbing system

  2. Day 8: Measure and Assess: PSI inspection

    • Tour of the home 10 stops
    • Types of materials used in plumbing 8 stops
    • Valves 16 stops
    • Ball valves throughout the system 10 stops
    • DWV 12 stops
    • Intro to bathroom fixtures 13 stops
    • Water heater safety and visual inspection 9 stops

    Open Day 8 in the plumbing system Water heater anatomy

  3. Day 10: Vendor visit, water heater flush, water pressure

    • Vendor visit 1: water heater, Moen, water quality 6 stops
    • Water heater flush (demo and lab) 5 stops
    • Water pressure test (demo and lab) 8 stops

    Open Day 10 in the plumbing system Water heater anatomy

  4. Day 11: Basement, venting, and gas leaks

    • Crawl space, basement, and attic inspections 12 stops
    • Plumbing ventilation and insulation 9 stops
    • Gas leak inspections 8 stops

    Open Day 11 in the plumbing system

  5. Day 12: Kitchen, laundry, and water

    • Vendor visit 2: water heater, Moen, water quality 6 stops
    • Kitchen and laundry fixtures 11 stops
    • What’s in our water 4 stops
    • Water treatment 8 stops

    Open Day 12 in the plumbing system

  6. Day 14: Water quality test and educating the homeowner

    • Water quality test (demo and lab) 6 stops
    • Educate the homeowner: review findings 12 stops

    Open Day 14 in the plumbing system

  7. Day 15: Vendor visit 3 and technical exam

    • Vendor visit 3: water heater, Moen, water quality 6 stops
    • Technical written exam review 20 stops

    Open Day 15 in the plumbing system

  8. Day 16: Perfect Plan: areas of improvement

    • Areas of improvement and options 15 stops

    Open Day 16 in the plumbing system

Recent updates